Plumbing engineers for your drafting room
Water and sewage documentation carried inside your bureau — your templates, your title block, your lead's redlines. From high-rise risers to pump rooms and fire hydrants.
What our engineers do on your team
Every line below happens under your lead engineer's direction — that is the whole point.
- Water & sewage documentation in your templates, sheet by sheet
- Riser diagrams and fixture schedules to your lead's redlines
- Pressure-zone splits and booster / pump-room drafting under your direction
- Hot-water and recirculation layouts inside your model
- Greywater and drainage runs drafted to your office standard
- Coordination with structure and architecture — in your meetings, your CDE
- Sheet setup, annotation and revision discipline in your title block
- Quantities and fixture counts for your internal checks
Direction, review and sign-off — always your lead's.
A working base. Your office writes the law.
The base below is a starting point, not a doctrine — the final standard is the one your office writes, and they arrive ready to absorb it.
Plumbing engineers in the team
Alexey T.
Andrey N.
Carried inside client teams
Two residential towers — Jerusalem area
Water, sewage and drainage albums for two residential towers — drafted inside the client's team, in the client's templates.
Residential high-rise — 9 storeys with basements
Full Revit plumbing model — pump room and fire hydrants included — carried inside the client's team.
Get plumbing candidates on your screen
Plumbing engineers selected and prepared for your brief — with the towers and basements they have carried behind them.