REQUEST AN ENGINEER
DISCIPLINE 01 — PLUMBING

Plumbing engineers for your drafting room

Water and sewage documentation carried inside your bureau — your templates, your title block, your lead's redlines. From high-rise risers to pump rooms and fire hydrants.

SCOPE OF HANDS

What our engineers do on your team

Every line below happens under your lead engineer's direction — that is the whole point.

  • Water & sewage documentation in your templates, sheet by sheet
  • Riser diagrams and fixture schedules to your lead's redlines
  • Pressure-zone splits and booster / pump-room drafting under your direction
  • Hot-water and recirculation layouts inside your model
  • Greywater and drainage runs drafted to your office standard
  • Coordination with structure and architecture — in your meetings, your CDE
  • Sheet setup, annotation and revision discipline in your title block
  • Quantities and fixture counts for your internal checks

Direction, review and sign-off — always your lead's.

THEY ARRIVE KNOWING

A working base. Your office writes the law.

The base below is a starting point, not a doctrine — the final standard is the one your office writes, and they arrive ready to absorb it.

הל״ת HALATIS 1205 · ת״י 1205Coordination & clashes RevitAutoCADPressure zones
HALAT and IS 1205 as a working baseהל״ת (the sanitary-installation instructions) and IS 1205 are the starting point they arrive with — the final standard is the one your bureau sets, and they arrive ready to absorb it.
Risers, zones and pump roomsPressure zoning logic, booster sets and riser diagrams they have drafted on real towers.
Revit & AutoCAD habitsFamilies, worksets, clean annotation — the habits local bureaus expect on day one.
THE PEOPLE

Plumbing engineers in the team

AT

Alexey T.

Plumbing engineer · BIM manager
Revit · AutoCAD · SI code stack
In client teams: 500+ hours on client projects — plumbing documentation and model management inside client processes.
AN

Andrey N.

Senior design engineer · Plumbing
High-rise & drainage specialist
In client teams: 740+ hours · 19 buildings — water, sewage and drainage albums.
CASEBOOK — PLUMBING

Carried inside client teams

PLUMBING · RESIDENTIAL TOWERS
2towers

Two residential towers — Jerusalem area

Water, sewage and drainage albums for two residential towers — drafted inside the client's team, in the client's templates.

UNDERClient's plumbing lead
SCOPEWater · sewage · drainage albums
PLUMBING · HIGH-RISE
9floors + basements

Residential high-rise — 9 storeys with basements

Full Revit plumbing model — pump room and fire hydrants included — carried inside the client's team.

UNDERClient's plumbing lead
SCOPERevit model · pump room · hydrants
START TODAY

Get plumbing candidates on your screen

Plumbing engineers selected and prepared for your brief — with the towers and basements they have carried behind them.